Case Study 1 – JUWI/Windhunter: Costa Rica – Wind Farm PEG (Planta Eólica Guanacaste)
PEG is one of the largest wind energy projects in Latin America. A wind farm with 55 wind turbines has been developed and is now operated by the JUWI Group in Costa Rica.
Case Study 2 – Cube-Engineering GmbH: Desert Project Ras al-Kaimah
Seven fully equipped measuring stations in an inaccessible desert region. Objectives: site development and subsequent construction of futuristic urban development project Ras al-Kaimah Eco City.